We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Support for response applications.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Support for response applications - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Support for response applications Product List

1~1 item / All 1 items

Displayed results

Support for obtaining JC-STAR★1 in response to the 2027 system interconnection requirement revision.

Support from confirming whether the product is applicable, organizing necessary responses, preparing applications, to obtaining compliance labels.

Are you prepared to respond to JC-STAR★1 in light of the revisions to the grid interconnection requirements in 2027? Due to the revision of the grid interconnection technical requirements for communication-enabled control systems used in solar power generation and storage batteries, the use of products that have obtained JC-STAR★1 is expected to be required. For special high voltage and high voltage, this will apply from April 2027, while for low voltage (under 50kW), it is scheduled to apply from October 2027, taking transitional measures into account. Therefore, for manufacturers developing, producing, and selling solar and storage battery-related equipment, early confirmation of eligibility and preparation for acquisition is crucial. Do you have any of these concerns? - I don't know if our products are eligible for JC-STAR★1 acquisition. - I don't understand how the 2027 grid interconnection requirement revisions will affect our products. - I don't know what preparations are necessary for obtaining JC-STAR★1. - I want to organize how to address security requirements. - I want to proceed with application preparations, but it's difficult to manage internally. You can consult with us starting from the stage of wanting to confirm whether your products are eligible. If you want to know more about the 2027 system response and obtaining JC-STAR★1, please download the materials and take a look.

  • 3-2.png
  • 3-3.png
  • 3-4.png
  • Solar power generator
  • Support for response applications

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Support for response applications